Jennings High

Lady Bulldog Softball
2018-19 JHS Band
Students in Ag Class
P.E. Activities
Students in Ag Class
2018 JHS Varsity Football
JHS Track Field

New and improved track field.

2018 JHS Football Coaches

2018 JHS Football Coaches

JHS Football
Science inquiry.
JHS 4-H Reading to Elementary Students
JHS Bulldog Baseball
JHS Lady Bulldog Softball Team
Students in Academic Center
Student Art
2018 JHS Trainers
JHS Entrance
JHS Pep Rally
Aerial View of JHS

Arial view of JHS Campus.

JHS Tennis
JHS Bulldog Track
JHS Senior Band Members
Students in Class
JHS Veteran's Day Program
Art/Fine Art Survey
Tile Art by Students
Aerial View of JHS
JHS Senior Football
Roscoe in the JHS Library

News and Announcements

George Rodrigue Foundation Art Contest

The George Rodrigue Foundation of the Arts (GRFA) has announced its call for entries for the 2019 Art Contest, marking the foundation's 10th anniversary of the statewide program. The contest is open to all Louisiana high school juniors and seniors. Applications will be accepted until January 18, 2019.

2018-2019 YEARBOOKS

Yearbooks can be pre-ordered for the 2018-2019 school year. Price is $60 until January 1, $70 after. Seniors may reserve Senior/Baby Ad spots - see Mrs. Louviere.

Zigler Mini Grant Program

Applications for the 18-19 Zigler Mini-Grant Program can be picked up in the Front Office. Deadline for applications is November 30, 2018 and recipients will be notified by January 7, 2019.

Information: Jennings Proposed Bond Issue-March 2019 Excerpt From "Campus Construction, Renovations Eyed" By Sheila Smith Published In The Jennings Daily News October 30, 2018

(Editor’s note: The following article focuses on proposals expected to the included on March 2019 ballots. These items are not on ballots currently being cast in early voting ahead of the Nov. 6 election.)
Voters in three different school districts will decide next year whether to back proposals for new or renovated campuses in the parish.
The March 30, 2019, vote will involve School District 2 in Jennings, Consolidated School District 1 in Welsh and School District 22 in Elton.
Superintendent of schools Kirk Credeur said school board members and some central office personnel would soon begin meeting with civic clubs and elected officials to share details on proposals, as well as receive public feedback.
SCHOOL DISTRICT 2 (JENNINGS)
A half-cent sales tax and 13-mill property tax currently fund a series of voter-backed bonds that provided for the construction of Jennings High School. This current series will be paid off in March 2023.
Essentially extending these two taxes would fund the construction of an elementary school that would house pre-K through sixth grade. At this time, James Ward Elementary educates students in grade pre-K through two and third through sixth-grade students attend Jennings Elementary (JES).
“The district would not be asking the public to approve additional taxes,” Credeur said. “As it stands now, those taxes are set to expire when the JHS bonds are paid off. If voters chose to extend these same taxes, the tax revenue would then begin funding bonds for a new elementary school."
No location, blueprints or a school name have been determined, but the cost for such a project is estimated at $29 million. Credeur said JHS was built for about $25 million in 2004.
If a new elementary is built, the James Ward and JES building would possibly be demolished.
“Financially, it is not feasible to remodel or upgrade the two elementary schools in Jennings,” Credeur said. “We would have to replace so much just to meet today’s building codes that the costs would be astronomical. We also have to consider that many of our students are still being educated in temporary buildings. Our Classrooms are growing, so we need to prepare for more student enrollment.”
“A new elementary would not only provide additional space,” he said, “but a safer, efficient and technologically-advanced building.”
A few concerns and factors to be considered, according to Credeur, include the following:
*The JES and James Ward buildings were designed to standards of their time. This included ample rollout windows and courtyards that were used to increase ventilation. With these buildings now cooled and heated with central units, the windows actually allow central air to escape the building.
Courtyards were initially utilized to increase airflow through windows. Now they offer their own issues.“
These courtyards hold water.” Credeur said. “Any time there is significant rainfall, those areas flood and you have standing water for a while.”
The Jennings district would likely see reduced HVAC costs with a new building.
“You would go from cooling and heating two old buildings to one efficient building,” he said.
On top of efficiency problems, the windows also pose modern safety concerns.
“If you look at our two elementary buildings from the street, you can see through a number of windows that face into hallways and classrooms, so you see when students are coming and going,” Credeur said, “That’s not safe in today’s world, but this was not something that needed to be considered decades ago.“
*The architect is keeping in mind that students up to first grade must be effectively separated from those in grades three and up.
“JHS is a great example of how younger students are separated from high schoolers in one building.” Credeur said, “With ideas for the elementary campus, we’re even considering how the age groups can move in and out of rooms they would have to share, like computer labs, without interacting with one another.”
*No location has been chosen for a new school. Many factors must go into choosing a site. Credeur said issues that must be considered include available acreage, road access, traffic flow and sewage and water needs, just to name a few.
“For a new elementary, we would need at least 20 acres, because you do have to consider needs for future plans,” he said. “Plus, by law, we can’t pay more than the appraised value for and, and we can’t necessarily pay very high appraised values, either. We have to keep in mind that we are stewards of public dollars.”
Even finding land at low cost could have its downfall. For example, Credeur said, purchasing land within a flood zone would impact the district’s annual flood insurance premiums.
“We will also need a site that will allow for good traffic flow,” he said. “You can see that the streets around James Ward get very crowded in the mornings and afternoons. The staff there is very organized and moves vehicles through quickly. But you do see that congestion twice a day during school hours.”
“School officials would like to see drop-off and pick-up area designed so that all vehicles are parked off main roads. Additionally, larger covered areas would be planned to accommodate the dropping off or picking up of more than one student at a time.” Credeur said separate areas would be required for students utilizing bus transportation.
*While combining campuses might lead to cutting costs for utilities and certain inventory, this does not mean staff and faculty numbers would be reduced or increased.
“When we look at reducing staffing numbers at any school, we do it through attrition,”
Credeur said. “For example, if at the end of the year a teacher is retiring but we have staff in place to cover her subjects or enrollment numbers show hiring a replacement is not necessary then that position would not be filled with a new person. We do not have the goal of cutting any staff numbers with the creation of a new school.”
Ultimately, the superintendent added, school board members have the final say on creating or eliminating any position within the parish system.
The board members whose districts include Jennings are Phillip Arceneaux District 3; Robert Menard District 4; Don Dees, District 5; David Capdeville , District 6; and District 7, Jimmy Segura. District 8, represented by David Doise, includes a portion of the city.

Tutoring

Union Baptist Church located at 1014 South Main St., Jennings is offering FREE tutoring for students in 2nd-12th grades every Monday from 4:30 - 5:30 PM. Students are to bring assignments with them.

Show All News »

Upcoming Events

Christmas Band Concert
Date: 12/18/2018, 6:30 PM 8 PM
Location: JHS Cafe.
Christmas Break
Date: 12/24/2018
Christmas Break
Date: 12/25/2018
Christmas Break
Date: 12/26/2018
Christmas Break
Date: 12/27/2018